D J Mace & Son recently carried out work in Royal Botanical Gardens, Kew, London. We supplied and installed 2 new bespoke main switch panels to upgrade the mains distribution within 2 of the buildings located on site.

They had to be delivered to site via flatbed truck and then lifted by hoist inside the switch rooms. They were then sited on new concrete plinths in the switch rooms ready for connection to the already existing main sub mains.

image

image 2